Recently, SmartGen Redundant Parallel Control Module---HGM9530N equipped with Weichai Baudouin engine, has completed debugging successfully. The successful launch of the system will provide new solutions for various data centers and core projects at home and abroad.


Engine: Weichai Baudouin 16M33



Redundant Parallel Control Module: HGM9530N



15-inch color touch screen centralized monitoring



On-site debugging in high temperature environment




System Single Line Diagram



System completes synchronous load within 15s in static parallel model.



Redundant Control System Diagram



The system has dual CAN bus communication redundancy, and can seamlessly switch to the slave module after the failure of the master module; the generator set can meet the power supply demand with excellent performance under the condition of suddenly increasing unexpected 100% load.


Centralized Monitoring System



HGM9530N redundant parallel Control Module, with its rich hardware interfaces, high-precision sampling, powerful PID algorithm; efficient dialogue and quick response between master-slave modules, can fully meet the functional requirements of the Control Module in data center projects. We believe that HGM9530N will have more chances to meet you in the following data center and major projects construction.




16 次查看0 則留言
作家相片Zhengzhou SmartGen

“Innovation and initiative, lean and perfection.” SmartGen is one of the most influential equipment manufacturers and solution providers in the global generator set industry. We insist on innovation since established, continuously improve the level of intelligent manufacturing, create value for partners.


Bar code binding for assembly process solutions of SmartGen:


Question

The bar code of the PCB and the shell are generated in MES and ERP respectively during controllers production process. The naming rules and contents of the two bar codes are different. Binding and connecting two bar codes before products assembly can achieve overall process tracing of controllers. And this manual binding will reduce the efficiency of the current process.


Solution

Changing manual binding to automatic binding.



If you have the same confusion or needs, please leave your message~~

The world is full of imagination. Wish you and me fly with the notes~~




2 次查看0 則留言
作家相片Zhengzhou SmartGen

——Eight Gensets were remodeled to realize parallel connection of different powers by HGM9510


There are four 500kW Cummins gensets and four 800kW Cummins units, as well as two generator rooms. One room is for the four 500kW gensets and the other one is for the four 800kW genesets. The original two gensets were connected in parallel respectively, the previous system had poor parallel effect while the parallel failure and uneven load distribution often occurred.


The two are integrated into one by parallel remodeling of HGM9510. The MSC communication distance between the 8 units is 50 meters, the MSC communications of the first unit and the final unit need a 120 Ω matching resistor in parallel respectively, which make users realize 8 units connect in parallel easily through "3 keys" (manual key, starting key, closing key). The simple operation and reliable performance receive consistent affirmation by users. They will no longer have to worry about parallel failures and uneven load distribution.



Multi Units Parallel Application Diagram