This case is the renovation project of a domestic factory


1. Renovation Reasons

1) The eight gensets used other brands of parallel system, but they often failed to connect every time they needed to generate power in parallel. And after parallel connection, the load distribution is uneven, and the genset will stop due to overload.

2) After each mains power failure, genset shall be started manually. The operator on duty in the high-voltage distribution room turns on the switch, and the mains switch in the low-voltage distribution room does not lose voltage and trip. The operator on duty also needs to open the mains switch first and then close the generator switch. The process is cumbersome and not timely and safe.


2. Site Overview

The original emergency power of this factory is divided into two phases, with a total of eight gensets. The first phase is 500kW*4 gensets and the second phase is 800kW*4 gensets. Low-voltage distribution room is divided into five phases, each of which is powered by two mains transformers for two loads, for a total of 10 loads. The layout of the generator room and distribution room is shown in Figure 1.



Fig.1 Layout of the Generator Room and Distribution Room


3. Renovation Scheme

The renovation project is divided into two stages:

1) Parallel control of 8 gensets by HGM9510.

2) Transfer 10-way emergency power cabinet and 10-way mains power cabinet into grid-connected control power by HGM9560.

Considering the long distance from the generator room to the low-voltage distribution room, long-distance transmission of MSC communication will cause data loss or abnormal communication. Therefore, the SGCAN300 CANBUS relay module is selected to convert MSCCAN signals into optical fiber signals for long-distance transmission. Eight SGCAN300 modules are selected for this project.



Fig.2 SGCAN300 CANBUS Relay Module



Fig.3 Typical Application of MSC1 and Optical Fiber Conversion




Fig.4 Typical Application of Multi-unit Parallel and Multiple Mains Grid-connection



Fig.5 Installation and Connection Diagram of SGCAN300 in the Cabinet


4. Result of the Renovation




Fig.6 Distribution Room 1



Fig.7 Distribution Room 2



Fig.8 Distribution Room 3、4



Fig.9 Distribution Room 5



Fig.10 Generator Room 1



Fig.11 Generator Room 2




0 次查看0 則留言
作家相片Zhengzhou SmartGen

The inevitable factor of success does not depend on me, but the process of success must have my participation.


My friends, you must muster strong confidence when you feel pessimistic and disappointed. You should believe that there is no wasted effort in the world. The inevitable factor of success does not depend on me, but all my effort will not be in vain.

-To The Students Who Graduate This Year By Hu Shi


"If we say that the inevitable factor of success does not depend on me" is a realm and a pursuit, then "the process of success must have my participation" is a duty and a responsibility.


More than three thousand years ago, Da Yu was so dedicated to dealing with flood that he refused to enter his room three times when passing by. More than two thousand years ago, Confucius led his disciples around the country to lobby the rulers to implement the policy of love for the people. More than a thousand years ago, Zhang Qian went the western region to promote communication between the Han Dynasty and the Huns. Although they live in different times, they all embody a common spirit. Nowadays, this spirit isn't abandoned by people with changes of the times, but is deeply branded in the hearts of each of SmartGeners.



As an individual, the production director personally led us to install and debug equipment during the weekend to ensure normal production on Monday; The leader of the preliminary test line accidentally hurt his leg on the way to work, but considering that the task of the preliminary test line was tight recently and short-handed, he resolutely came to work; There was also a temporary decision for the controller's post-process to work late for delivery... Their families and children need their care and accompany, but they know clearly that as a producer, delivery date is important! They will not easily confide their difficulties and efforts to their leaders. They all clearly understand that they are employees of SmartGen, workers from the first production line. Delivery date is their mission, and the mission must be reached! They’re always there when the users need them.


Among them, some have worked in the company for over ten years, some may not be highly educated, and some may not even understand what lean manufacturing is and what lean thinking is. But when the leadership gives a clear instruction, they will support and implement it without hesitation. Some employees didn’t use computers, some employees didn’t know what MES system was, and some employees didn’t know how to operate ERP software. But each of them was so eager for new knowledge, new equipment, new culture that it was like going back to school. Although they have different foundation, everyone is working hard. They don’t want to waste time that they can strive for, so they take the initiative to get certificates, learn all kinds of office and automation software, learn ISO9001... They are always on the way of learning, and never stop their step!



As the core department of product manufacturing, the electronic workshop is responsible for the important link of product realization and delivery. In daily work, the electronic workshop closely cooperates with other departments, which fully embodies the enterprise spirit of SmartGen: "continuous improvement, teamwork creates value." When the controller shipment volume increased, the bottleneck process employees took the initiative to temporarily increase the night shift to not delay the delivery date. Considering the safety of two female employees, the department leader advised male colleagues to work on the night shift. The two female employees insisted on working on the night shift since they worried that the unskilled skills of the other staff will affect product quality. Female employees are excellent as their male colleagues. When electronic control workshop learned this, they gave their hands. As the electronic control workshop faced explosive order situation, the electronic workshop was the first to give their hands, and other departments also offered help. As the saying goes: "Throw in peach, quoted in pear."


Under the influence of our enterprise culture, the employees of electronic workshop are positive and initiative, hard-working, and never give up. You saw their figures in various activities: 5S competition, improvement project competition, beer festival, annual party, sport meeting, etc. They all signed up bravely, participated actively, and achieved outstanding results.


To explore a more scientific and efficient working way, they discussed seriously, sometimes even fiercely, about the working methods with other colleagues from technology and quality department. But didn’t worry how intense they talked, because they were still good friends when the problem was solved.


"They are like a ball of fire if they united together, they will be like a starry sky if they separated with one another." They are the symbol of youth and vitality. They never thought that the company’s development was because of someone from them. But when mentioning SmartGen, they will proudly say, "we are from SmartGen!"




1 次查看0 則留言
作家相片Zhengzhou SmartGen

The clear and refreshing weather always motivates people to make progress. In this harvest season, leaders and engineers from SCANIA dealers in Shanghai and Chongqing have come all the way to SmartGen to jointly open another marine engine exchange meeting in 2020!




Accompanied by company's leaders, the leaders and experts of SCANIA dealers completely visited and learned SmartGen, from company's development to the research and development process of products, from the company management concept to the R & D center, from the industry-leading dust-free and anti-static electronic production workshop, control cabinet processing workshop to product test center.



At the meeting, SmartGen introduced the relevant products, solutions and application cases of SCANIA engine, as well as the introduction and interpretation of SmartGen marine supporting products and discussed and summarized the projects under cooperation and completed by both sides at present.



In addition, engineers from SCANIA dealers demonstrated and explained the current marine power solutions, technical parameters, applicable ship types and customer groups of SCANIA engines, so that everyone had a deeper understanding of the application fields and advantages of the products of both sides.



We have gained a lot from this exchange meeting and would like to thank leaders and engineers from SCANIA dealer for their valuable advice and guidance! Looking forward to our meeting again and a brighter tomorrow!




1 次查看0 則留言
bottom of page